TRANSMISSION LINES
Whether a newly proposed transmission project consists of 2 structures or 200 miles of them, our team of engineers, designers, and drafters provide comprehensive design services that will take a power line project from conception to completion on time and within budget.
PRE-CONSTRUCTION SERVICES
Through years of experience, we’ve learned the best way to finish a project successfully is to have a successful pre-construction program. Here at PowerWright, extreme care is taken to fully plan our projects from beginning to end, anticipating likely issues or contingencies (and their solutions) before the first auger ever hits the soil.
Pre-Construction Services include:
-
Right of Way Services
-
Routing Studies
-
Feasibility Studies
-
Permit Acquisition
-
Design Criteria Definition
-
Site Optimization
-
Schedule Development
-
Conceptual/Preliminary Engineering
-
Conceptual Estimates
-
Life Cycle Cost Analysis
-
Landowner Interaction and Communication
-
Surveying
-
Environmental Studies
-
Other services provided through our design partners
DETAILED DESIGN
No matter the size or scope, PowerWright Technologies has the expertise to complete even the most challenging projects using the latest design software and our cutting-edge design approach. We utilize PLS-CADD, PLS-Pole, MFAD, and several in-house developed applications.
Design and Support Services include:
-
New Line Design
-
Uprating Analysis and Design
-
Routine Maintenance Projects
-
Standard and Specification Development
-
LiDAR Clearance Violation Remediation
-
Structural Analysis
-
Storm Hardening
-
Drafting
-
Equipment and Material Procurement/ Expediting
-
Program Management
CONSTRUCTION SERVICES
Once the design has been completed, PowerWright's team of seasoned construction professionals is available for construction support and inspection. Our inspectors work closely with our engineering team to provide real-time answers to the unexpected issues that tend to arise during any project in order to keep you on track.
Related Projects
3 mile – 230kV Greenfield Transmission Line Project
7.8 mile – 138kV Transmission Line Relocation/ Rebuild Project
NERC Alert Point of Interest (POI) Remediation